[spoiler="pics"]Safe shutdown PCB:

Battery charging:

Battery full:

As soon as the AIO arrives I can finish up and get playing

Would you mind posting a picture of low battery when you get a chance? Also can I a link of where to buy the fibre optic? I'm guessing it wires directly from the safe shutdown pcb.Mischief wrote:Got Camble's safe shutdown PCB today so went ahead and installed it, also installed a piece of 3mm fibre optic in the bottom to act as the charging LED, the safe shutdown script should take care of low battery notification but will work on installing another piece of fibre optic cable if needed.
As soon as the AIO arrives I can finish up and get playing
Can't picture low battery as I haven't finished yet, I took my GBZ apart ready for when the AIO turns upGanreizu wrote:
Would you mind posting a picture of low battery when you get a chance? Also can I a link of where to buy the fibre optic? I'm guessing it wires directly from the safe shutdown pcb.
Users browsing this forum: No registered users and 1 guest